Technology Infrastructure Upgrade Project (E-Rate)

  • $10,000,000
  • Design-Bid-Build, General Construction Contract
  • IT Upgrade at 13 different school sites, simultaneously
  • New category 6 and Fiber backbone cabling installed at each site
  • Upgraded Power, Audio Visual, HVAC, Fire Alarm, and Intrusion
  • 62 new MDF and IDF rooms, including new structures and retrofit
  • WCA performed all HVAC, Plumbing, and General Construction
Scroll to Top