La Mesa Spring Valley Energy Upgrades
Design Build Contract
15 projects over the course of 14 months
Each project site consisted of mechanical upgrades ranging from Chiller and CHW piping to Air handling units and duct work
WCA was able to maximize energy consumption by being proactive with the equipment chosen and seeing the long term pay out for the client
In total 3 Chillers, 1 Cooling Tower, 78 RTUs / Package Units, 13 Pumps, 6 Boilers, 82 VAV Units, and 22 VFD Units were installed