La Mesa Spring Valley Energy Upgrades

  • Design Build Contract
  • 15 projects over the course of 14 months
  • Each project site consisted of mechanical upgrades ranging from Chiller and CHW piping to Air handling units and duct work
  • WCA was able to maximize energy consumption by being proactive with the equipment chosen and seeing the long term pay out for the client
  • In total 3 Chillers, 1 Cooling Tower, 78 RTUs / Package Units, 13 Pumps, 6 Boilers, 82 VAV Units, and 22 VFD Units were installed